ITAC Assessment: TS0003
ITAC logo
ITAC Assessment: TS0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product PRINTING CALENDARS
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,569 767,878
kWh
Natural Gas $33,350 6,108
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,178 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,937

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.4151: Minimize water usage $3,197 $6 $77
1,172
kWh
- $3,120
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,050 $1,400 $2,050
37,808
kWh
- -
03 2.2511: Insulate bare equipment $541 - $667
12,016
kWh
$(-126.0)
-
MMBtu
-
04 2.7492: Use proper thickness of insulation on building envelope $11,700 $25,770 - $11,700
-
MMBtu
-
05 2.7111: Reduce illumination to minimum necessary levels $1,190 $400 $1,500
24,619
kWh
$(-310.0)
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,500 $500 - $1,500
-
MMBtu
-
TOTAL RECOMMENDED $20,178 $28,076 $4,294
75,615
kWh
$12,764
-
MMBtu
$3,120
TOTAL IMPLEMENTED $7,937 $2,306 $3,627
63,599
kWh
$1,190
-
MMBtu
$3,120
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs