ITAC Assessment: TR0072
ITAC logo
ITAC Assessment: TR0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Half turn bards and multi turn coils
NAICS 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
SIC 1731: Electrical Work
Sales Range $50
M
to 100
M
# of Employees 355
Plant Area 128,000
ft2
Annual Production 2,430
units
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $178,332 2,043,660
kWh
Electricity Demand $22,835 5,331
kW-mo/yr
Electricity Fees $14,227 -
TOTAL YEARLY COSTS $215,394
RECOMMENDED SAVINGS* $143,192 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $42,902 $11,046 $42,656
488,838
kWh
$246
-
kW-mo/yr
02 2.4322: Use or replace with energy efficient substitutes $9,517 $37,400 $9,464
108,461
kWh
$53
-
kW-mo/yr
03 2.9114: Use solar heat to make electricty $50,450 $226,581 $46,029
527,496
kWh
$4,420
-
kW-mo/yr
04 2.2511: Insulate bare equipment $40,322 $6,200 $40,023
460,031
kWh
$300
-
kW-mo/yr
TOTAL RECOMMENDED $143,192 $281,228 $138,172
1,584,826
kWh
$5,020
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs