ITAC Assessment: TR0070
ITAC logo
ITAC Assessment: TR0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Vegetables
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 136
Plant Area 175,000
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 4,500
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $576,119 15,645,095
kWh
Electricity Demand $301,252 37,665
kW-mo/yr
Electricity Fees $65,224 -
Waste Disposal Costs
Water Usage $327,412 152,669
Tgal
TOTAL YEARLY COSTS $1,270,008
RECOMMENDED SAVINGS* $6,541 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7495: Install replacement doors $1,282 $12,350 $771
20,952
kWh
$511
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,224 $3,744 $1,409
38,250
kWh
$816
-
kW-mo/yr
03 2.7243: Improve air circulation with destratification fans / other methods $3,035 $9,500 $1,922
52,220
kWh
$1,113
-
kW-mo/yr
TOTAL RECOMMENDED $6,541 $25,594 $4,101
111,422
kWh
$2,440
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs