ITAC Assessment: TR0066
ITAC logo
ITAC Assessment: TR0066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product drinkable water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 10
Plant Area 1,546,380
ft2
Annual Production 1,830
Tgal
Production Hrs. Annual 8,748
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,976 1,866,120
kWh
Electricity Demand $15,332 3,833
kW-mo/yr
Electricity Fees $1,020 -
TOTAL YEARLY COSTS $148,328
RECOMMENDED SAVINGS* $118,807 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,412 $450 $2,412
5,018
kWh
-
02 2.7232: Replace existing hvac unit with high efficiency model $4,689 $5,500 $4,352
61,531
kWh
$338
-
kW-mo/yr
03 2.4133: Use most efficient type of electric motors $1,231 $5,900 $1,143
16,157
kWh
$89
-
kW-mo/yr
04 2.9114: Use solar heat to make electricty $110,475 $743,970 $100,929
1,427,074
kWh
$9,546
-
kW-mo/yr
TOTAL RECOMMENDED $118,807 $755,820 $108,835
1,509,780
kWh
$9,972
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs