ITAC Assessment: TR0060
ITAC logo
ITAC Assessment: TR0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Aircraft turbine and engine components: blades, nozzles, and hangers.
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range greater than $500
M
# of Employees 475
Plant Area 108,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 8,472
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $522,509 13,194,671
kWh
Electricity Demand $657,416 35,383
kW-mo/yr
TOTAL YEARLY COSTS $1,179,925
RECOMMENDED SAVINGS* $339,007 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.9114: Use solar heat to make electricty $179,721 $1,013,437 $101,474
2,562,480
kWh
$78,247
-
kW-mo/yr
-
02 2.3212: Optimize plant power factor $27,671 $119,707 - $27,671
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $966 $1,779 $966
24,399
kWh
- -
04 2.4322: Use or replace with energy efficient substitutes $5,636 $37,000 $3,429
86,591
kWh
$2,207
-
kW-mo/yr
-
05 2.7232: Replace existing hvac unit with high efficiency model $102,201 $64,400 $62,214
1,571,058
kWh
$39,987
-
kW-mo/yr
-
06 2.8121: Apply for tax-free status for energy purchases $22,813 $4,000 - - $22,813
TOTAL RECOMMENDED $339,007 $1,240,323 $168,083
4,244,529
kWh
$148,111
-
kW-mo/yr
$22,813
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs