ITAC Assessment: MA0633
ITAC logo
ITAC Assessment: MA0633
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product coating for leather finishing
NAICS 325510: Paint and Coating Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 28
Plant Area 24,000
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 2,600
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,021 666,200
kWh
Electricity Demand $19,543 2,936
kW-mo/yr
Electricity Fees $192 -
Natural Gas $59,993 4,363
MMBtu
Other Energy $74,100 71
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,600 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings
01 2.2622: Replace existing chiller with high efficiency model $76,628 $85,000 $2,528
19,300
kWh
- - $74,100
-
MMBtu
02 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $8,944 $25,000 $5,554
42,400
kWh
$3,390
-
kW-mo/yr
- -
03 2.2136: Install / repair insulation on steam lines $857 $300 $733
5,600
kWh
- $124
-
MMBtu
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,171 - $2,171
16,575
kWh
- - -
TOTAL RECOMMENDED $88,600 $110,300 $10,986
83,875
kWh
$3,390
-
kW-mo/yr
$124
-
MMBtu
$74,100
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs