Assessment Year | 2008 |
---|---|
Principal Product | coating for leather finishing |
NAICS | 325510: Paint and Coating Manufacturing |
SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
Sales Range | $10 M to 50M |
# of Employees | 28 |
Plant Area |
24,000
ft2
|
Annual Production | 13,000,000
lb
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $87,021 | 666,200 |
kWh
|
$0.13 |
Electricity Demand | $19,543 | 2,936 |
kW-mo/yr
|
$6.66 |
Electricity Fees | $192 | - |
|
- |
Natural Gas | $59,993 | 4,363 |
MMBtu
|
$13.75 |
Other Energy | $74,100 | 71 |
MMBtu
|
$1,043.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $88,600 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Energy Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2622: Replace existing chiller with high efficiency model | $76,628 | $85,000 |
$2,528
19,300
kWh
|
- | - |
$74,100
-
MMBtu
|
|
02 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $8,944 | $25,000 |
$5,554
42,400
kWh
|
$3,390
-
kW-mo/yr
|
- | - | |
03 | 2.2136: Install / repair insulation on steam lines | $857 | $300 |
$733
5,600
kWh
|
- |
$124
-
MMBtu
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,171 | - |
$2,171
16,575
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $88,600 | $110,300 |
$10,986
83,875
kWh
|
$3,390
-
kW-mo/yr
|
$124
-
MMBtu
|
$74,100
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs