ITAC Assessment: TR0047
ITAC logo
ITAC Assessment: TR0047
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Clean water supply and wastewater treatment
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area 4,060,638
ft2
Annual Production 803,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,053 2,019,072
kWh
Electricity Demand $16,632 4,158
kW-mo/yr
Electricity Fees $2,040 -
TOTAL YEARLY COSTS $183,725
RECOMMENDED SAVINGS* $67,363 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,503

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7232: Replace existing hvac unit with high efficiency model $1,719 $3,675 $1,611
19,710
kWh
$108
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,784 $1,015 $2,634
32,237
kWh
$150
-
kW-mo/yr
03 2.9114: Use solar heat to make electricty $62,860 $264,693 $62,860
768,957
kWh
-
TOTAL RECOMMENDED $67,363 $269,383 $67,105
820,903
kWh
$258
-
kW-mo/yr
TOTAL IMPLEMENTED $4,503 $4,690 $4,245
51,947
kWh
$258
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs