ITAC Assessment: TR0040
ITAC logo
ITAC Assessment: TR0040
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Fiberglass doors and frames
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 33,300
ft2
Annual Production 11,636
units
Production Hrs. Annual 2,860
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,140 517,600
kWh
Electricity Demand $12,509 2,856
kW-mo/yr
Electricity Fees $23,279 -
Waste Disposal Costs
Water Usage $1,412 232
Tgal
Water Disposal $1,318 220
Tgal
TOTAL YEARLY COSTS $104,658
RECOMMENDED SAVINGS* $21,471 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,162

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,084 $4,166 $2,084
16,284
kWh
-
02 2.9114: Use solar heat to make electricty $11,309 $128,100 $9,523
74,400
kWh
$1,786
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,078 $15,000 $8,078
63,106
kWh
-
TOTAL RECOMMENDED $21,471 $147,266 $19,685
153,790
kWh
$1,786
-
kW-mo/yr
TOTAL IMPLEMENTED $10,162 $19,166 $10,162
79,390
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs