ITAC Assessment: TR0034
ITAC logo
ITAC Assessment: TR0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Drinking water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 34
Plant Area 507,959
ft2
Annual Production 9,125
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $320,451 7,660,800
kWh
Electricity Demand $167,257 19,018
kW-mo/yr
Electricity Fees $34,441 -
TOTAL YEARLY COSTS $522,149
RECOMMENDED SAVINGS* $70,375 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,070

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Usage Savings
01 2.7232: Replace existing hvac unit with high efficiency model $31,116 $50,670 $6,983
166,938
kWh
$24,133
-
kW-mo/yr
- -
02 3.8121: Cover containers to minimize evaporative losses $5,133 $79,969 - - - $5,133
-
Tgal
03 2.8121: Apply for tax-free status for energy purchases $22,602 $2,500 - - $22,602 -
04 2.4131: Size electric motors for peak operating efficiency $11,468 $36,208 $8,904
212,861
kWh
$2,564
-
kW-mo/yr
- -
05 2.7423: Reduce heat gain by window tinting $56 $846 $30
724
kWh
$26
-
kW-mo/yr
- -
TOTAL RECOMMENDED $70,375 $170,192 $15,917
380,523
kWh
$26,724
-
kW-mo/yr
$22,602 $5,133
-
Tgal
TOTAL IMPLEMENTED $34,070 $38,708 $8,904
212,861
kWh
$2,564
-
kW-mo/yr
$22,602 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs