ITAC Assessment: TR0031
ITAC logo
ITAC Assessment: TR0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $5
M
to 10
M
# of Employees 21
Plant Area 3,172,505
ft2
Annual Production 2,600,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $243,485 4,141,440
kWh
Electricity Demand $38,331 7,792
kW-mo/yr
Waste Disposal Costs
Water Usage $936,000 2,600,000
Tgal
TOTAL YEARLY COSTS $1,217,816
RECOMMENDED SAVINGS* $140,429 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,105

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $15,178 $384,300 $13,169
223,200
kWh
$2,009
-
kW-mo/yr
- -
02 3.8121: Cover containers to minimize evaporative losses $122,147 $1,154,745 - - $122,147 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $488 $1,258 $488
8,278
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,172 $1,434 $1,172
19,868
kWh
- - -
05 3.7311: Maintain machines to reduce leaks $1,263 $684 - - $28 $1,234
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $181 - $181
3,075
kWh
- - -
TOTAL RECOMMENDED $140,429 $1,542,420 $15,011
254,421
kWh
$2,009
-
kW-mo/yr
$122,175 $1,234
TOTAL IMPLEMENTED $3,105 $3,375 $1,842
31,221
kWh
- $28 $1,234
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs