| Assessment Year | 2023 |
|---|---|
| Principal Product | Water |
| NAICS | 221310: Water Supply and Irrigation Systems |
| SIC | 4941: Water Supply |
| Sales Range | $5 M to 10M |
| # of Employees | 21 |
| Plant Area |
3,172,505
ft2
|
| Annual Production | 2,600,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $243,485 | 4,141,440 |
kWh
|
$0.059 | |
| Electricity Demand | $38,331 | 7,792 |
kW-mo/yr
|
$4.92 | |
| Waste Disposal Costs | |||||
| Water Usage | $936,000 | 2,600,000 |
Tgal
|
$0.36 | |
| TOTAL YEARLY COSTS | $1,217,816 | ||||
| RECOMMENDED SAVINGS* | $140,429 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $3,105 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $15,178 | $384,300 |
$13,169
223,200
kWh
|
$2,009
-
kW-mo/yr
|
- | - | |
| 02 | 3.8121: Cover containers to minimize evaporative losses | $122,147 | $1,154,745 | - | - | $122,147 | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $488 | $1,258 |
$488
8,278
kWh
|
- | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,172 | $1,434 |
$1,172
19,868
kWh
|
- | - | - | |
| 05 | 3.7311: Maintain machines to reduce leaks | $1,263 | $684 | - | - | $28 | $1,234 | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $181 | - |
$181
3,075
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $140,429 | $1,542,420 |
$15,011
254,421
kWh
|
$2,009
-
kW-mo/yr
|
$122,175 | $1,234 | ||
| TOTAL IMPLEMENTED | $3,105 | $3,375 |
$1,842
31,221
kWh
|
- | $28 | $1,234 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs