ITAC Assessment: TR0030
ITAC logo
ITAC Assessment: TR0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Produce
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 50,000
ft2
Annual Production 75,000
units
Production Hrs. Annual 4,368
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,168 1,425,600
kWh
Electricity Demand $47,440 4,236
kW-mo/yr
Electricity Fees $12,883 -
Waste Disposal Costs
Water Usage $21,337 4,969
Tgal
TOTAL YEARLY COSTS $159,828
RECOMMENDED SAVINGS* $23,117 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,117

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $13,094 $200,200 $8,184
148,000
kWh
$4,910
-
kW-mo/yr
02 2.7135: Install occupancy sensors $133 $195 $133
2,422
kWh
-
03 2.3191: Use demand controller or load shedder $6,145 $7,000 - $6,145
-
kW-mo/yr
04 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $3,744 $7,758 $3,744
68,078
kWh
-
TOTAL RECOMMENDED $23,117 $215,153 $12,061
218,499
kWh
$11,055
-
kW-mo/yr
TOTAL IMPLEMENTED $23,117 $215,153 $12,061
218,499
kWh
$11,055
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs