ITAC Assessment: TR0029
ITAC logo
ITAC Assessment: TR0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product polyurethane foam for automobile and office furniture
NAICS 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 89,600
ft2
Annual Production 1,800,000
pieces
Production Hrs. Annual 8,640
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,321 1,128,610
kWh
Electricity Demand $34,667 3,501
kW-mo/yr
Electricity Fees $2,643 -
TOTAL YEARLY COSTS $103,630
RECOMMENDED SAVINGS* $10,693 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,986

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,939 $24,345 $5,379
89,648
kWh
$2,560
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,047 $5,000 $852
14,199
kWh
$195
-
kW-mo/yr
03 4.652: Replace existing equipment with more suitable substitutes $1,707 $2,500 $224
3,745
kWh
$1,483
-
kW-mo/yr
TOTAL RECOMMENDED $10,693 $31,845 $6,455
107,592
kWh
$4,238
-
kW-mo/yr
TOTAL IMPLEMENTED $8,986 $29,345 $6,231
103,847
kWh
$2,755
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs