ITAC Assessment: TR0026
ITAC logo
ITAC Assessment: TR0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Corrugated Shipping Containers
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 153
Plant Area 180,000
ft2
Annual Production 37,000,000,000
thousand feet
Production Hrs. Annual 4,680
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,181 2,124,384
kWh
Electricity Demand $50,406 6,381
kW-mo/yr
Electricity Fees $505 -
Natural Gas $15,219 5,298
MMBtu
TOTAL YEARLY COSTS $121,311
RECOMMENDED SAVINGS* $26,731 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,655 $3,928 $924
36,077
kWh
$731
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $108 $156 $108
4,217
kWh
- - -
03 2.2511: Insulate bare equipment $1,448 $30 $1,353
52,863
kWh
$95
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,284 $1,000 $2,392
93,429
kWh
$1,892
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $359 $1,000 $188
7,344
kWh
$171
-
kW-mo/yr
- -
06 2.8121: Apply for tax-free status for energy purchases $18,877 $5,000 - - $4,719 $14,158
TOTAL RECOMMENDED $26,731 $11,114 $4,965
193,930
kWh
$2,889
-
kW-mo/yr
$4,719 $14,158
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs