ITAC Assessment: TR0022
ITAC logo
ITAC Assessment: TR0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Gas main valves
NAICS 332911: Industrial Valve Manufacturing
SIC 3491: Industrial Valves
Sales Range greater than $500
M
# of Employees 280
Plant Area 49,937
ft2
Annual Production 30,000,000
units
Production Hrs. Annual 4,680
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,466 1,747,440
kWh
Electricity Demand $56,647 5,506
kW-mo/yr
Electricity Fees $15,273 -
Natural Gas $6,612 5,863
MMBtu
Waste Disposal Costs
Water Usage $9,474 693
Tgal
TOTAL YEARLY COSTS $190,472
RECOMMENDED SAVINGS* $30,652 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,623

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.3132: Recharge batteries on during off-peak demand periods $1,078 - - $1,078
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,125 $1,000 $776
13,234
kWh
$349
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,666 $10,056 $5,975
101,970
kWh
$2,691
-
kW-mo/yr
- -
04 2.7212: Install or upgrade insulation on hvac distribution systems $204 $102 $140
2,396
kWh
$63
-
kW-mo/yr
- -
05 2.8121: Apply for tax-free status for energy purchases $11,951 $15,000 - - $11,951 -
06 3.6192: Use a less expensive method of waste removal $7,628 - - - - $7,628
TOTAL RECOMMENDED $30,652 $26,158 $6,891
117,599
kWh
$4,181
-
kW-mo/yr
$11,951 $7,628
TOTAL IMPLEMENTED $17,623 $11,158 $6,891
117,599
kWh
$3,103
-
kW-mo/yr
- $7,628
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs