ITAC Assessment: TR0019
ITAC logo
ITAC Assessment: TR0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Water Supply
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 6
Plant Area 535,788
ft2
Annual Production 5,110,000
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,652 3,967,920
kWh
Electricity Demand $154,618 15,916
kW-mo/yr
Electricity Fees $3,643 -
TOTAL YEARLY COSTS $314,913
RECOMMENDED SAVINGS* $178,073 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $637

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3191: Use demand controller or load shedder $41,476 $21,000 - $41,476
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $637 $2,470 $381
9,636
kWh
$256
-
kW-mo/yr
-
03 2.9121: Install wind powered electric generator $135,960 $1,346,000 $81,647
2,067,000
kWh
- $54,313
TOTAL RECOMMENDED $178,073 $1,369,470 $82,027
2,076,636
kWh
$41,732
-
kW-mo/yr
$54,313
TOTAL IMPLEMENTED $637 $2,470 $381
9,636
kWh
$256
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs