ITAC Assessment: TR0018
ITAC logo
ITAC Assessment: TR0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Sewarage treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 6
Plant Area 994,816
ft2
Annual Production 1,916,250
Tgal
Production Hrs. Annual 8,544
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,061 3,487,440
kWh
Electricity Demand $76,947 7,420
kW-mo/yr
Electricity Fees $6,483 -
TOTAL YEARLY COSTS $221,491
RECOMMENDED SAVINGS* $25,656 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,991

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.3191: Use demand controller or load shedder $11,196 $14,000 - $11,196
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,055 $1,825 $2,231
56,493
kWh
$823
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,937 $6,050 $2,841
71,916
kWh
$2,096
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,038 $308 $132
3,336
kWh
$47
-
kW-mo/yr
$858
05 2.4311: Recover mechanical energy $5,431 $25,000 $5,431
137,493
kWh
- -
TOTAL RECOMMENDED $25,656 $47,183 $10,635
269,238
kWh
$14,163
-
kW-mo/yr
$858
TOTAL IMPLEMENTED $7,991 $7,875 $5,072
128,409
kWh
$2,919
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs