Assessment Year | 2019 |
---|---|
Principal Product | Custom injection molding for consumer, medical, communications and automotive applications |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 38 |
Plant Area |
47,332
ft2
|
Annual Production | 7,000,000
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $91,121 | 2,351,520 |
kWh
|
$0.039 | |
Electricity Demand | $55,451 | 5,247 |
kW-mo/yr
|
$10.57 | |
Electricity Fees | $10,391 | - |
|
- | |
Waste Disposal Costs | |||||
Water Usage | $2,838 | 1,965 |
Tgal
|
$1.44 | |
Water Disposal | $2,386 | 1,965 |
Tgal
|
$1.21 | |
TOTAL YEARLY COSTS | $162,188 | ||||
RECOMMENDED SAVINGS* | $21,050 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $21,050 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8123: Pay utility bills on time | $2,781 | - | - | - | $2,781 | - | - | |
02 | 3.6192: Use a less expensive method of waste removal | $3,582 | - | - | - | - | - | $3,582 | |
03 | 2.7233: Use properly designed and sized hvac equipment | $9,971 | $8,500 |
$6,450
166,320
kWh
|
$3,521
-
kW-mo/yr
|
- | - | - | |
04 | 3.4155: Meter waste water | $719 | $1,511 | - | - | - |
$719
-
Tgal
|
- | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $3,996 | $8,838 |
$2,585
66,720
kWh
|
$1,411
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $21,050 | $18,849 |
$9,035
233,040
kWh
|
$4,932
-
kW-mo/yr
|
$2,781 |
$719
-
Tgal
|
$3,582 | ||
TOTAL IMPLEMENTED | $21,050 | $18,849 |
$9,035
233,040
kWh
|
$4,932
-
kW-mo/yr
|
$2,781 |
$719
-
Tgal
|
$3,582 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs