ITAC Assessment: CW0124
ITAC logo
ITAC Assessment: CW0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Frozen buns
NAICS 493120: Refrigerated Warehousing and Storage
SIC 4222: Refrigerated Warehousing and Storage
Sales Range greater than $500
M
# of Employees 215
Plant Area 158,000
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 8,640
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $273,391 4,231,929
kWh
Electricity Demand $54,335 8,064
kW-mo/yr
Electricity Fees $1,810 -
Natural Gas $21,126 3,237
MMBtu
Waste Disposal Costs
Water Usage $19,077 4,638
Tgal
Water Disposal $12,727 2,026
Tgal
Solid Waste (non-haz) $5,672 101,192
lb
TOTAL YEARLY COSTS $388,137
RECOMMENDED SAVINGS* $275,801 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Usage Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,407 $100 $1,407
21,991
kWh
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,378 $47,373 $17,378
271,532
kWh
- -
03 2.3142: User battery storage for power quality issues $230,341 $287,555 - - $230,341
04 4.112: Replace old machine with new automatic multi-station tool $7,380 - - - $7,380
05 4.426: Modify workload $16,860 - $16,860
262,215
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $929 $1,866 $929
14,509
kWh
- -
07 3.4159: Replace treated water with well / surface water $1,505 $2,582 - $1,667
-
Tgal
$(-161.6)
TOTAL RECOMMENDED $275,801 $339,476 $36,574
570,247
kWh
$1,667
-
Tgal
$237,560
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs