ITAC Assessment: TR0011
ITAC logo
ITAC Assessment: TR0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Fabricated structural metal
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3411: Metal Cans
Sales Range $5
M
to 10
M
# of Employees 185
Plant Area 99,728
ft2
Annual Production 9,600
ton
Production Hrs. Annual 3,450
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,298 963,840
kWh
Electricity Demand $50,561 4,822
kW-mo/yr
Electricity Fees $2,027 -
Natural Gas $2,750 223
MMBtu
TOTAL YEARLY COSTS $113,636
RECOMMENDED SAVINGS* $21,001 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,953

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $1,048 $200 - - $210 $838
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,457 $7 $906
15,098
kWh
$551
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,336 $1,000 $797
13,289
kWh
$539
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,895 $10,120 $5,895
98,243
kWh
- - -
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $5,830 $2,354 $5,830
97,174
kWh
- - -
06 2.4321: Upgrade obsolete equipment $5,435 $4,500 - - $5,435 -
TOTAL RECOMMENDED $21,001 $18,180 $13,428
223,804
kWh
$1,090
-
kW-mo/yr
$5,644 $838
TOTAL IMPLEMENTED $19,953 $17,980 $13,428
223,804
kWh
$1,090
-
kW-mo/yr
$5,435 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs