ITAC Assessment: MO0045
ITAC logo
ITAC Assessment: MO0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product FROZEN BAKERY PRODUCTS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 432
Plant Area
n/a
Annual Production 4,800,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $987,148 19,653,869
kWh
Natural Gas $199,174 50,098
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,507 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $2,396 $4,327 $2,396
48,066
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $496 - $496
9,965
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,885 - $3,679
86,753
kWh
$(-794.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,224 $2,578 $1,224
24,619
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $3,276 $390 $3,276
65,651
kWh
-
06 2.2515: Use optimum thickness insulation $1,230 $857 $1,230
24,619
kWh
-
TOTAL RECOMMENDED $11,507 $8,152 $12,301
259,673
kWh
$(-794.0)
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs