ITAC Assessment: TR0010
ITAC logo
ITAC Assessment: TR0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Bottled and canned soft drinks
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 62
Plant Area 202,800
ft2
Annual Production 3,233,690
units
Production Hrs. Annual 4,750
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $283,886 6,569,221
kWh
Electricity Demand $215,571 20,765
kW-mo/yr
Natural Gas $37,771 17,318
MMBtu
Waste Disposal Costs
Water Usage $36,727 76,862
Tgal
TOTAL YEARLY COSTS $573,955
RECOMMENDED SAVINGS* $48,967 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,967

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.3212: Optimize plant power factor $16,540 $17,881 - $16,540
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $30,332 $36,474 $19,307
441,930
kWh
$11,025
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $1,984 $70 - - $1,984
-
MMBtu
-
04 2.2135: Repair and eliminate steam leaks $111 $100 - - $82
-
MMBtu
$30
-
Tgal
TOTAL RECOMMENDED $48,967 $54,525 $19,307
441,930
kWh
$27,565
-
kW-mo/yr
$2,066
-
MMBtu
$30
-
Tgal
TOTAL IMPLEMENTED $48,967 $54,525 $19,307
441,930
kWh
$27,565
-
kW-mo/yr
$2,066
-
MMBtu
$30
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs