Assessment Year | 2019 |
---|---|
Principal Product | Bottled and canned soft drinks |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $10 M to 50M |
# of Employees | 62 |
Plant Area |
202,800
ft2
|
Annual Production | 3,233,690
units
|
Production Hrs. Annual | 4,750
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $283,886 | 6,569,221 |
kWh
|
$0.043 | |
Electricity Demand | $215,571 | 20,765 |
kW-mo/yr
|
$10.38 | |
Natural Gas | $37,771 | 17,318 |
MMBtu
|
$2.18 | |
Waste Disposal Costs | |||||
Water Usage | $36,727 | 76,862 |
Tgal
|
$0.48 | |
TOTAL YEARLY COSTS | $573,955 | ||||
RECOMMENDED SAVINGS* | $48,967 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $48,967 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $16,540 | $17,881 | - |
$16,540
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $30,332 | $36,474 |
$19,307
441,930
kWh
|
$11,025
-
kW-mo/yr
|
- | - | |
03 | 2.2511: Insulate bare equipment | $1,984 | $70 | - | - |
$1,984
-
MMBtu
|
- | |
04 | 2.2135: Repair and eliminate steam leaks | $111 | $100 | - | - |
$82
-
MMBtu
|
$30
-
Tgal
|
|
TOTAL RECOMMENDED | $48,967 | $54,525 |
$19,307
441,930
kWh
|
$27,565
-
kW-mo/yr
|
$2,066
-
MMBtu
|
$30
-
Tgal
|
||
TOTAL IMPLEMENTED | $48,967 | $54,525 |
$19,307
441,930
kWh
|
$27,565
-
kW-mo/yr
|
$2,066
-
MMBtu
|
$30
-
Tgal
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs