ITAC Assessment: TR0008
ITAC logo
ITAC Assessment: TR0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Food: Tortillas
NAICS 311830: Tortilla Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 46,000
ft2
Annual Production 2,626,000
units
Production Hrs. Annual 5,510
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,565 800,764
kWh
Natural Gas $20,241 8,030
MMBtu
Waste Disposal Costs
Water Usage $9,160 22,306
Tgal
TOTAL YEARLY COSTS $106,966
RECOMMENDED SAVINGS* $48,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,223

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Fees Savings Primary Product Savings Increase in Production Savings
01 2.8121: Apply for tax-free status for energy purchases $1,536 $3,860 $1,536 - -
02 2.2511: Insulate bare equipment $692 $602 $692 - -
03 4.611: Begin a practice of predictive / preventative maintenance $28,264 $975 - - $28,264
04 3.7311: Maintain machines to reduce leaks $13,889 $1,000 $13,889 - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $534 $2,128 $534 - -
06 3.1191: Change procedures / equipment / operating conditions $3,464 - - $3,464 -
TOTAL RECOMMENDED $48,380 $8,564 $16,652 $3,464 $28,264
TOTAL IMPLEMENTED $44,223 $7,962 $15,959 - $28,264
Yearly Savings* Imp'd Cost* Electricity Fees Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs