ITAC Assessment: TP0015
ITAC logo
ITAC Assessment: TP0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Cakes, Brownies, Buns, Rolls and Breads
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 200,000,000
pieces
Production Hrs. Annual 4,400
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,514 2,840,270
kWh
Electricity Demand $37,676 5,651
kW-mo/yr
Natural Gas $69,478 27,004
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,220 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,309

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Water Consumption Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $4,906 $600 - - $4,906
-
MMBtu
- -
02 3.4116: Meter recycled water (to reduce sewer charges) $2,404 $6,200 - - - - $2,404
-
Tgal
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,255 $509 $1,650
52,462
kWh
$605
-
kW-mo/yr
- - -
04 4.821: Pay bills on time to avoid late fees $1,092 - - - - $1,092 -
05 2.7124: Make a practice of turning off lights when not needed $1,056 - $1,056
33,411
kWh
- - - -
06 2.4133: Use most efficient type of electric motors $566 $3,147 $214
8,792
kWh
$352
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $152 $634 $116
3,810
kWh
$36
-
kW-mo/yr
- - -
08 2.7144: Install spectral reflectors / delamp $455 $84 - $455
-
kW-mo/yr
- - -
09 2.2136: Install / repair insulation on steam lines $334 $301 - - $334
-
MMBtu
- -
TOTAL RECOMMENDED $13,220 $11,475 $3,036
98,475
kWh
$1,448
-
kW-mo/yr
$5,240
-
MMBtu
$1,092 $2,404
-
Tgal
TOTAL IMPLEMENTED $9,309 $1,109 $2,706
85,873
kWh
$605
-
kW-mo/yr
$4,906
-
MMBtu
$1,092 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs