ITAC Assessment: TP0009
ITAC logo
ITAC Assessment: TP0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Processed Meats
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $5
M
to 10
M
# of Employees 20
Plant Area
n/a
Annual Production 0
pieces
Production Hrs. Annual 2,304
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,448 571,805
kWh
Electricity Demand $6,446 1,202
kW-mo/yr
Electricity Fees $512 -
Natural Gas $1,098 246
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,056 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,848

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2515: Use optimum thickness insulation $2,208 $3,947 $1,471
41,032
kWh
$737
-
kW-mo/yr
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $627 - $501
11,430
kWh
$126
-
kW-mo/yr
03 2.7144: Install spectral reflectors / delamp $394 $160 $216
6,155
kWh
$178
-
kW-mo/yr
04 2.4133: Use most efficient type of electric motors $330 $872 $257
7,034
kWh
$73
-
kW-mo/yr
05 2.4314: Use synthetic lubricant $187 - $150
4,103
kWh
$37
-
kW-mo/yr
06 2.7135: Install occupancy sensors $123 $182 $123
3,517
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $105 $292 $52
1,465
kWh
$53
-
kW-mo/yr
08 2.7131: Add area lighting switches $82 - $82
2,345
kWh
-
TOTAL RECOMMENDED $4,056 $5,453 $2,852
77,081
kWh
$1,204
-
kW-mo/yr
TOTAL IMPLEMENTED $1,848 $1,506 $1,381
36,049
kWh
$467
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs