ITAC Assessment: TP0007
ITAC logo
ITAC Assessment: TP0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Heat Exchanger
NAICS
n/a
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area
n/a
Annual Production 110
pieces
Production Hrs. Annual 5,151
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,846 2,328,839
kWh
Electricity Demand $44,223 7,002
kW-mo/yr
Electricity Fees $6,088 -
Natural Gas $28,208 5,298
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,188 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3212: Optimize plant power factor $9,968 $8,500 n/a - $9,968
-
kW-mo/yr
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,504 $20,190 n/a $5,504
305,686
kWh
-
03 2.7124: Make a practice of turning off lights when not needed $2,254 $2,071 n/a $626
34,877
kWh
$1,628
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,560 $800 n/a $1,560
46,307
kWh
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,425 - n/a - $2,425
-
kW-mo/yr
06 2.4133: Use most efficient type of electric motors $177 $1,095 n/a $62
3,517
kWh
$115
-
kW-mo/yr
07 2.7135: Install occupancy sensors $300 $987 n/a $300
16,706
kWh
-
TOTAL RECOMMENDED $22,188 $33,643 $8,052
407,093
kWh
$14,136
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs