| Assessment Year | 1999 |
|---|---|
| Principal Product | Heat Exchanger |
| NAICS |
n/a
|
| SIC | 3433: Heating Equipment, Except Electric and Warm Air Furnaces |
| Sales Range | $10 M to 50M |
| # of Employees | 135 |
| Plant Area |
n/a
|
| Annual Production | 110
pieces
|
| Production Hrs. Annual | 5,151
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $53,846 | 2,328,839 |
kWh
|
$0.023 |
| Electricity Demand | $44,223 | 7,002 |
kW-mo/yr
|
$6.32 |
| Electricity Fees | $6,088 | - |
|
- |
| Natural Gas | $28,208 | 5,298 |
MMBtu
|
$5.32 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,188 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $9,968 | $8,500 | n/a | - |
$9,968
-
kW-mo/yr
|
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,504 | $20,190 | n/a |
$5,504
305,686
kWh
|
- |
| 03 | 2.7124: Make a practice of turning off lights when not needed | $2,254 | $2,071 | n/a |
$626
34,877
kWh
|
$1,628
-
kW-mo/yr
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,560 | $800 | n/a |
$1,560
46,307
kWh
|
- |
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,425 | - | n/a | - |
$2,425
-
kW-mo/yr
|
| 06 | 2.4133: Use most efficient type of electric motors | $177 | $1,095 | n/a |
$62
3,517
kWh
|
$115
-
kW-mo/yr
|
| 07 | 2.7135: Install occupancy sensors | $300 | $987 | n/a |
$300
16,706
kWh
|
- |
| TOTAL RECOMMENDED | $22,188 | $33,643 |
$8,052
407,093
kWh
|
$14,136
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs