ITAC Assessment: TP0003
ITAC logo
ITAC Assessment: TP0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Diodes, Transistors, and Integrated Circuits
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 96
Plant Area
n/a
Annual Production 11,781,268
pieces
Production Hrs. Annual 6,572
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,562 1,530,774
kWh
Electricity Demand $44,170 3,297
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,145 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,787

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $14,358 $14,651 $9,128
282,239
kWh
$5,230
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,133 - $3,133
96,717
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $642 $20 $386
12,016
kWh
$256
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $111 $393 $71
2,345
kWh
$40
-
kW-mo/yr
05 2.4133: Use most efficient type of electric motors $387 $12,392 $211
6,448
kWh
$176
-
kW-mo/yr
06 2.7111: Reduce illumination to minimum necessary levels $514 $190 $268
8,499
kWh
$246
-
kW-mo/yr
TOTAL RECOMMENDED $19,145 $27,646 $13,197
408,264
kWh
$5,948
-
kW-mo/yr
TOTAL IMPLEMENTED $4,787 $12,995 $4,069
126,025
kWh
$718
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings