Assessment Year | 2000 |
---|---|
Principal Product | distribution switch gear |
NAICS |
n/a
|
SIC | 3629: Electrical Industrial Apparatus, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 630 |
Plant Area |
360,000
ft2
|
Annual Production | 8,100
pieces
|
Production Hrs. Annual | 6,500
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $201,962 | 7,552,755 |
kWh
|
$0.027 |
Electricity Demand | $206,012 | 16,716 |
kW-mo/yr
|
$12.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,545,631 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $914,911 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.453: Reschedule breaks to allow for continuous production | $3,613,000 | $645,000 | - | - | $18,000 | - | $3,595,000 | |
02 | 4.451: Add additional production shift | $899,000 | $967,000 | - | - | - | - | $899,000 | |
03 | 2.2437: Recover waste heat from equipment | $10,500 | $700 |
$10,500
1,190,211
kWh
|
- | - | - | - | |
04 | 2.3191: Use demand controller or load shedder | $7,220 | $11,900 | - |
$7,220
-
kW-mo/yr
|
- | - | - | |
05 | 3.5311: Recover and reuse waste material | $4,210 | - | - | - | - |
$4,210
-
lb
|
- | |
06 | 2.6218: Turn off equipment when not in use | $3,650 | - |
$3,650
121,630
kWh
|
- | - | - | - | |
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,600 | $900 | - |
$3,600
-
kW-mo/yr
|
- | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,336 | - |
$2,611
87,046
kWh
|
$725
-
kW-mo/yr
|
- | - | - | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,115 | $1,300 |
$668
22,274
kWh
|
$447
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $4,545,631 | $1,626,800 |
$17,429
1,421,161
kWh
|
$11,992
-
kW-mo/yr
|
$18,000 |
$4,210
-
lb
|
$4,494,000 | ||
TOTAL IMPLEMENTED | $914,911 | $969,200 |
$6,929
230,950
kWh
|
$4,772
-
kW-mo/yr
|
- |
$4,210
-
lb
|
$899,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs