ITAC Assessment: TN0674
ITAC logo
ITAC Assessment: TN0674
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Hardwood Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 1,010,000
ft2
Annual Production 18,000
thousand feet
Production Hrs. Annual 4,275
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $159,482 1,913,834
kWh
Electricity Demand $50,674 6,351
kW-mo/yr
Electricity Fees $12,341 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $764,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,870

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Product Savings By-product Production Savings
01 3.1182: Make a new by-product $466,160 $455,420 $(-29,230.0)
(-885,698)
kWh
$(-57,320.0)
-
kW-mo/yr
$(-361,020.0)
-
lb
- - $913,730
02 4.445: Install equipment to move product $249,860 $667,440 $(-21,280.0)
(-644,783)
kWh
$(-23,860.0)
-
kW-mo/yr
- $256,000 $39,000 -
03 4.652: Replace existing equipment with more suitable substitutes $42,930 $25,500 - - - - $42,930 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,490 $750 $4,120
124,853
kWh
$370
-
kW-mo/yr
- - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,380 $500 $400
12,016
kWh
$980
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $764,820 $1,149,610 $(-45,990.0)
(-1,393,612)
kWh
$(-79,830.0)
-
kW-mo/yr
$(-361,020.0)
-
lb
$256,000 $81,930 $913,730
TOTAL IMPLEMENTED $5,870 $1,250 $4,520
136,869
kWh
$1,350
-
kW-mo/yr
- - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs