ITAC Assessment: TN0656
ITAC logo
ITAC Assessment: TN0656
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Rayon staple fiber
NAICS
n/a
SIC 2923:
Sales Range $50
M
to 100
M
# of Employees 410
Plant Area 1,000,000
ft2
Annual Production 115,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $200,299 7,789,566
kWh
Electricity Demand $104,651 10,924
kW-mo/yr
Electricity Fees $(-17,475.0) -
Coal $5,840,640 4,563,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $874,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $327,320

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Coal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 3.4111: Use closed cycle process to minimize waste water production $400,000 $618,000 - - - - $400,000
-
Tgal
02 2.1212: Operate boilers on high fire setting $175,220 $82,400 $175,220
-
MMBtu
- - - -
03 3.4151: Minimize water usage $143,010 $60,900 $48,400
-
MMBtu
- - - $94,610
-
Tgal
04 4.443: Install automatic boiler fuel feed system $130,100 $137,500 - - $(-52,420.0) $182,520 -
05 3.5313: Increase amount of waste recovered for resale $22,000 - - $22,000
-
lb
- - -
06 2.2511: Insulate bare equipment $2,020 $3,560 $2,020
-
MMBtu
- - - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,800 $2,380 $1,800
-
MMBtu
- - - -
TOTAL RECOMMENDED $874,150 $904,740 $227,440
-
MMBtu
$22,000
-
lb
$(-52,420.0) $182,520 $494,610
-
Tgal
TOTAL IMPLEMENTED $327,320 $219,900 $175,220
-
MMBtu
$22,000
-
lb
$(-52,420.0) $182,520 -
Yearly Savings* Imp'd Cost* Coal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs