ITAC Assessment: TN0651
ITAC logo
ITAC Assessment: TN0651
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Safety Switches
NAICS
n/a
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $50
M
to 100
M
# of Employees 243
Plant Area 165,000
ft2
Annual Production 740,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $155,424 4,896,835
kWh
Electricity Demand $98,489 11,417
kW-mo/yr
Electricity Fees $5,328 -
Natural Gas $38,312 6,206
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,870 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,060

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Primary Product Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $23,000 $21,000 - - - - - $(-70,000.0) $93,000
02 3.2123: Convert to high volume low pressure (hvlp) paint guns $9,040 $9,140 $9,040
274,033
kWh
- - - - - -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,840 $8,000 - - $4,840 - - - -
04 2.2511: Insulate bare equipment $3,020 $1,605 - - - $3,020
-
MMBtu
- - -
05 3.2123: Convert to high volume low pressure (hvlp) paint guns $2,625 $900 - - - - $2,625
-
gal
- -
06 3.5112: Reprocess spent oils on site for re-use $1,465 $2,420 - - - $370
-
MMBtu
$1,095
-
gal
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $880 $1,120 $290
8,792
kWh
$590
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $44,870 $44,185 $9,330
282,825
kWh
$590
-
kW-mo/yr
$4,840 $3,390
-
MMBtu
$3,720
-
gal
$(-70,000.0) $93,000
TOTAL IMPLEMENTED $12,060 $10,745 $9,040
274,033
kWh
- - $3,020
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs