ITAC Assessment: TN0636
ITAC logo
ITAC Assessment: TN0636
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Hydraulic cylinders
NAICS
n/a
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $10
M
to 50
M
# of Employees 126
Plant Area 62,000
ft2
Annual Production 17,200
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,804 1,414,127
kWh
Electricity Demand $31,254 3,624
kW-mo/yr
Electricity Fees $1,466 -
Natural Gas $14,691 2,256
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,420 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $995

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Increase in Production Savings
01 4.514: Re-arrange equipment layout to reduce handling costs $46,480 $37,380 - - $46,480
02 3.6192: Use a less expensive method of waste removal $1,455 - - $1,455
-
lb
-
03 2.2511: Insulate bare equipment $670 $220 $670
29,894
kWh
- -
04 2.2437: Recover waste heat from equipment $490 $980 $490
21,981
kWh
- -
05 3.6192: Use a less expensive method of waste removal $175 - - $175
-
lb
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $150 $600 $150
6,448
kWh
- -
TOTAL RECOMMENDED $49,420 $39,180 $1,310
58,323
kWh
$1,630
-
lb
$46,480
TOTAL IMPLEMENTED $995 $820 $820
36,342
kWh
$175
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs