Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product air springs
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 320,000
ft2
Annual Production 6,500,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $344,704 12,896,249
kWh
Electricity Demand $97,408 23,137
kW-mo/yr
Electricity Fees $59,384 -
Natural Gas $248,169 62,312
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $127,005 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $109,355

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings By-product Production Savings
01 3.5218: Reuse / recycle/ sell rubber products $100,000 $122,130 - - - $16,200
-
lb
- $83,800
02 3.5316: Contract a wood pallet recycling company $8,140 - - - - $8,140
-
lb
- -
03 2.2437: Recover waste heat from equipment $3,960 $7,010 - - $3,960
-
MMBtu
- - -
04 2.1331: Burn a less expensive grade of fuel $2,770 $5,450 - - $2,770
-
MMBtu
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,625 $7,110 $2,120
84,994
kWh
$505
-
kW-mo/yr
- - - -
06 3.5212: Regrind, reuse, or sell scrap plastic parts $270 - - - - $270
-
lb
- -
07 4.111: Add equipment/ operators to reduce production bottleneck $9,240 $18,600 - - - - $9,240 -
TOTAL RECOMMENDED $127,005 $160,300 $2,120
84,994
kWh
$505
-
kW-mo/yr
$6,730
-
MMBtu
$24,610
-
lb
$9,240 $83,800
TOTAL IMPLEMENTED $109,355 $141,700 $2,120
84,994
kWh
$505
-
kW-mo/yr
$6,730
-
MMBtu
$16,200
-
lb
- $83,800
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs