ITAC Assessment: TN0626
ITAC logo
ITAC Assessment: TN0626
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Animal feed
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 110,000
ft2
Annual Production 325,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,002 4,467,761
kWh
Electricity Demand $126,184 15,803
kW-mo/yr
Electricity Fees $2,047 -
Natural Gas $76,070 17,721
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $160,886 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,395

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 4.445: Install equipment to move product $147,240 $377,000 $(-15,000.0)
(-498,242)
kWh
- - $162,240 - -
02 3.5311: Recover and reuse waste material $6,480 $500 - - $3,480
-
lb
- - $3,000
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,860 $4,550 $970
32,239
kWh
$1,890
-
kW-mo/yr
- - - -
04 3.6192: Use a less expensive method of waste removal $2,535 - - - $7,410
-
lb
- $(-4,875.0) -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,390 - $790
26,377
kWh
$600
-
kW-mo/yr
- - - -
06 3.5217: Reuse / recycle/ sell paper products $381 $600 - - $381
-
lb
- - -
TOTAL RECOMMENDED $160,886 $382,650 $(-13,240.0)
(-439,626)
kWh
$2,490
-
kW-mo/yr
$11,271
-
lb
$162,240 $(-4,875.0) $3,000
TOTAL IMPLEMENTED $5,395 $4,550 $970
32,239
kWh
$1,890
-
kW-mo/yr
$7,410
-
lb
- $(-4,875.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs