Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Coated Paper Rolls
NAICS
n/a
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 180,000
ft2
Annual Production 57,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $260,683 9,885,698
kWh
Electricity Demand $213,216 20,924
kW-mo/yr
Electricity Fees $35,443 -
Natural Gas $89,272 23,666
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $407,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $159,725

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Primary Product Savings
01 3.5212: Regrind, reuse, or sell scrap plastic parts $140,000 $56,120 - - - $(-60,000.0)
-
lb
- - $200,000 -
02 3.5215: Avoid contamination of end pieces and reuse as feed stock $81,250 $2,400 - - - - - - $81,250 -
03 4.431: Train operators for maximum operating efficiency $77,680 $121,440 - - - - $(-113,570.0) - - $191,250
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $52,045 $61,760 - - - $47,425
-
lb
$(-1,500.0) $6,120 - -
05 3.1191: Change procedures / equipment / operating conditions $30,000 $16,200 - - - - - - $30,000 -
06 2.7122: Disconnect ballasts $13,255 $900 $8,610
331,184
kWh
$4,645
-
kW-mo/yr
- - - - - -
07 2.3212: Optimize plant power factor $9,920 $16,200 - - $9,920 - - - - -
08 2.2511: Insulate bare equipment $1,980 $380 $1,980
76,202
kWh
- - - - - - -
09 2.2625: Chill water to the highest temperature possible $1,230 - $1,230
47,186
kWh
- - - - - - -
TOTAL RECOMMENDED $407,360 $275,400 $11,820
454,572
kWh
$4,645
-
kW-mo/yr
$9,920 $(-12,575.0)
-
lb
$(-115,070.0) $6,120 $311,250 $191,250
TOTAL IMPLEMENTED $159,725 $199,400 - - - $47,425
-
lb
$(-115,070.0) $6,120 $30,000 $191,250
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs