Assessment Year | 1998 |
---|---|
Principal Product | Coated Paper Rolls |
NAICS |
n/a
|
SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 120 |
Plant Area |
180,000
ft2
|
Annual Production | 57,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $260,683 | 9,885,698 |
kWh
|
$0.026 |
Electricity Demand | $213,216 | 20,924 |
kW-mo/yr
|
$10.19 |
Electricity Fees | $35,443 | - |
|
- |
Natural Gas | $89,272 | 23,666 |
MMBtu
|
$3.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $407,360 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $159,725 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $140,000 | $56,120 | - | - | - |
$(-60,000.0)
-
lb
|
- | - | $200,000 | - | |
02 | 3.5215: Avoid contamination of end pieces and reuse as feed stock | $81,250 | $2,400 | - | - | - | - | - | - | $81,250 | - | |
03 | 4.431: Train operators for maximum operating efficiency | $77,680 | $121,440 | - | - | - | - | $(-113,570.0) | - | - | $191,250 | |
04 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $52,045 | $61,760 | - | - | - |
$47,425
-
lb
|
$(-1,500.0) | $6,120 | - | - | |
05 | 3.1191: Change procedures / equipment / operating conditions | $30,000 | $16,200 | - | - | - | - | - | - | $30,000 | - | |
06 | 2.7122: Disconnect ballasts | $13,255 | $900 |
$8,610
331,184
kWh
|
$4,645
-
kW-mo/yr
|
- | - | - | - | - | - | |
07 | 2.3212: Optimize plant power factor | $9,920 | $16,200 | - | - | $9,920 | - | - | - | - | - | |
08 | 2.2511: Insulate bare equipment | $1,980 | $380 |
$1,980
76,202
kWh
|
- | - | - | - | - | - | - | |
09 | 2.2625: Chill water to the highest temperature possible | $1,230 | - |
$1,230
47,186
kWh
|
- | - | - | - | - | - | - | |
TOTAL RECOMMENDED | $407,360 | $275,400 |
$11,820
454,572
kWh
|
$4,645
-
kW-mo/yr
|
$9,920 |
$(-12,575.0)
-
lb
|
$(-115,070.0) | $6,120 | $311,250 | $191,250 | ||
TOTAL IMPLEMENTED | $159,725 | $199,400 | - | - | - |
$47,425
-
lb
|
$(-115,070.0) | $6,120 | $30,000 | $191,250 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs