ITAC Assessment: TN0604
ITAC logo
ITAC Assessment: TN0604
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Ready-mix concrete plants
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 106,000
ft2
Annual Production 50
pieces
Production Hrs. Annual 3,025
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,347 837,339
kWh
Electricity Demand $18,627 2,930
kW-mo/yr
Electricity Fees $6,245 -
Natural Gas $20,305 4,429
MMBtu
Other Energy $850 134
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,293 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,312

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 3.5248: Separate and recycle scrap metal to foundry or for sale $36,000 - - - - - - - $36,000 -
02 4.111: Add equipment/ operators to reduce production bottleneck $28,880 $7,540 - - - - - $28,880 - -
03 2.7231: Use radiant heater for spot heating $16,711 $30,300 - - $15,861
-
MMBtu
$850
-
MMBtu
- - - -
04 4.421: Modify current incentive program $6,500 $10,000 - - - - - - - $6,500
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,770 $10,800 - - - - $3,770
-
lb
- - -
06 2.4314: Use synthetic lubricant $432 - $111
3,810
kWh
$321
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $92,293 $58,640 $111
3,810
kWh
$321
-
kW-mo/yr
$15,861
-
MMBtu
$850
-
MMBtu
$3,770
-
lb
$28,880 $36,000 $6,500
TOTAL IMPLEMENTED $65,312 $7,540 $111
3,810
kWh
$321
-
kW-mo/yr
- - - $28,880 $36,000 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs