ITAC Assessment: TN0601
ITAC logo
ITAC Assessment: TN0601
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Carpentry tools
NAICS
n/a
SIC 3423: Hand and Edge Tools, Except Machine Tools and Handsaws
Sales Range $5
M
to 10
M
# of Employees 106
Plant Area 110,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,664 1,548,945
kWh
Electricity Demand $39,773 5,631
kW-mo/yr
Electricity Fees $1,748 -
Natural Gas $74,619 10,479
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,005

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
01 4.711: Initiate a total quality management program $13,200 - - - - - $(-45,000.0) - $58,200
02 3.1191: Change procedures / equipment / operating conditions $4,865 $8,000 - - - $4,865
-
lb
- - -
03 3.5313: Increase amount of waste recovered for resale $3,270 - - - - $3,270
-
lb
- - -
04 2.2511: Insulate bare equipment $2,960 $295 $2,960
95,545
kWh
- - - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,045 - $430
13,775
kWh
$1,565
-
kW-mo/yr
- - - $50 -
06 2.7122: Disconnect ballasts $1,190 $180 $700
22,567
kWh
$490
-
kW-mo/yr
- - - - -
07 2.2511: Insulate bare equipment $170 $180 - - $170
-
MMBtu
- - - -
TOTAL RECOMMENDED $27,700 $8,655 $4,090
131,887
kWh
$2,055
-
kW-mo/yr
$170
-
MMBtu
$8,135
-
lb
$(-45,000.0) $50 $58,200
TOTAL IMPLEMENTED $5,005 $295 $3,390
109,320
kWh
$1,565
-
kW-mo/yr
- - - $50 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings