ITAC Assessment: TN0596
ITAC logo
ITAC Assessment: TN0596
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Frozen poultry products
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 70,000
ft2
Annual Production 75,000,000
lb
Production Hrs. Annual 6,552
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $440,097 14,691,384
kWh
Electricity Demand $267,365 29,353
kW-mo/yr
Natural Gas $289,685 82,492
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $269,180 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $93,770

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings
01 2.5194: Redesign process $97,310 $38,900 $(-620.0)
(-20,516)
kWh
$(-350.0)
-
kW-mo/yr
- - $98,280 -
02 3.4156: Use flow control valves on equipment to optimize water use $80,150 $1,130 - - - $47,300
-
Tgal
- $32,850
-
Tgal
03 2.2437: Recover waste heat from equipment $40,800 $99,260 - - $40,800
-
MMBtu
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $37,300 $61,100 $37,300
1,243,552
kWh
- - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,870 $4,200 $4,300
143,611
kWh
$2,570
-
kW-mo/yr
- - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $6,170 $7,000 $3,370
112,251
kWh
$2,800
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $580 $410 $110
3,810
kWh
$470
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $269,180 $212,000 $44,460
1,482,708
kWh
$5,490
-
kW-mo/yr
$40,800
-
MMBtu
$47,300
-
Tgal
$98,280 $32,850
-
Tgal
TOTAL IMPLEMENTED $93,770 $12,740 $7,780
259,672
kWh
$5,840
-
kW-mo/yr
- $47,300
-
Tgal
- $32,850
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs