| Assessment Year | 1996 |
|---|---|
| Principal Product | Analytical instruments |
| NAICS |
n/a
|
| SIC | 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products |
| Sales Range | $10 M to 50M |
| # of Employees | 290 |
| Plant Area |
160,000
ft2
|
| Annual Production | 10,000
pieces
|
| Production Hrs. Annual | 4,030
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $311,925 | 9,278,429 |
kWh
|
$0.034 |
| Natural Gas | $32,692 | 8,457 |
MMBtu
|
$3.87 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $62,897 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $47,242 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.8142: Distill contaminated solvents for reuse | $45,192 | $51,320 | - | - |
$42,665
-
gal
|
$2,527 | - | |
| 02 | 2.7273: Install desiccant humidity control system | $14,500 | $13,000 | - |
$14,500
-
MMBtu
|
- | - | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,760 | $5,300 |
$1,760
56,858
kWh
|
- | - | - | - | |
| 04 | 2.7233: Use properly designed and sized hvac equipment | $610 | $1,800 |
$610
19,637
kWh
|
- | - | - | - | |
| 05 | 2.7124: Make a practice of turning off lights when not needed | $545 | - |
$450
14,654
kWh
|
- | - | - | $95 | |
| 06 | 2.7135: Install occupancy sensors | $290 | $845 |
$290
9,379
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $62,897 | $72,265 |
$3,110
100,528
kWh
|
$14,500
-
MMBtu
|
$42,665
-
gal
|
$2,527 | $95 | ||
| TOTAL IMPLEMENTED | $47,242 | $57,465 |
$2,050
66,237
kWh
|
- |
$42,665
-
gal
|
$2,527 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs