ITAC Assessment: TN0588
ITAC logo
ITAC Assessment: TN0588
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Analytical instruments
NAICS
n/a
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $10
M
to 50
M
# of Employees 290
Plant Area 160,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 4,030
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $311,925 9,278,429
kWh
Natural Gas $32,692 8,457
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,897 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,242

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.8142: Distill contaminated solvents for reuse $45,192 $51,320 - - $42,665
-
gal
$2,527 -
02 2.7273: Install desiccant humidity control system $14,500 $13,000 - $14,500
-
MMBtu
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,760 $5,300 $1,760
56,858
kWh
- - - -
04 2.7233: Use properly designed and sized hvac equipment $610 $1,800 $610
19,637
kWh
- - - -
05 2.7124: Make a practice of turning off lights when not needed $545 - $450
14,654
kWh
- - - $95
06 2.7135: Install occupancy sensors $290 $845 $290
9,379
kWh
- - - -
TOTAL RECOMMENDED $62,897 $72,265 $3,110
100,528
kWh
$14,500
-
MMBtu
$42,665
-
gal
$2,527 $95
TOTAL IMPLEMENTED $47,242 $57,465 $2,050
66,237
kWh
- $42,665
-
gal
$2,527 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs