ITAC Assessment: TN0584
ITAC logo
ITAC Assessment: TN0584
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Hydrated Silicon Dioxide and Sodium Silico Aluminate
NAICS
n/a
SIC 2816: Inorganic Pigments
Sales Range $50
M
to 100
M
# of Employees 138
Plant Area 552,000
ft2
Annual Production 120,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,581,820 61,465,417
kWh
Electricity Demand $623,208 105,006
kW-mo/yr
Natural Gas $1,694,097 659,410
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $215,107 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $212,707

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.2442: Preheat combustion air with waste heat $63,310 $13,760 - - $63,310
-
MMBtu
- - -
02 4.431: Train operators for maximum operating efficiency $49,571 - - - - $29,867
-
lb
$9,852 $9,852
03 2.2135: Repair and eliminate steam leaks $38,633 $2,920 - - $38,633
-
MMBtu
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $36,437 $43,540 $13,815
531,360
kWh
$22,622
-
kW-mo/yr
- - - -
05 2.4314: Use synthetic lubricant $13,037 - $5,578
214,537
kWh
$7,459
-
kW-mo/yr
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,580 $6,920 $2,789
107,268
kWh
$3,791
-
kW-mo/yr
- - - -
07 3.6112: Use filter and drying oven to reduce sludge volume $2,057 $38,920 - - $(-5,331.0)
-
MMBtu
- - $7,388
08 3.5316: Contract a wood pallet recycling company $2,400 - - - - $2,400
-
lb
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $2,050 $4,900 $2,050
78,839
kWh
- - - - -
10 3.5315: Lease / purchase baler; sell cardboard to recycler $1,032 - - - - $1,032
-
lb
- -
TOTAL RECOMMENDED $215,107 $110,960 $24,232
932,004
kWh
$33,872
-
kW-mo/yr
$96,612
-
MMBtu
$33,299
-
lb
$9,852 $17,240
TOTAL IMPLEMENTED $212,707 $110,960 $24,232
932,004
kWh
$33,872
-
kW-mo/yr
$96,612
-
MMBtu
$30,899
-
lb
$9,852 $17,240
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs