ITAC Assessment: TN0577
ITAC logo
ITAC Assessment: TN0577
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Work Uniforms
NAICS
n/a
SIC 2326: Men's and Boys' Work Clothing
Sales Range $10
M
to 50
M
# of Employees 124
Plant Area 54,000
ft2
Annual Production 18,000,000
pieces
Production Hrs. Annual 2,095
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,396 839,683
kWh
Electricity Demand $23,541 3,032
kW-mo/yr
Natural Gas $16,817 2,503
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,100 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,733

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings By-product Production Savings
01 3.5313: Increase amount of waste recovered for resale $26,249 $12,000 - - - $3,510
-
lb
$(-2,527.0) $25,266
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,118 $526 $141
4,689
kWh
$1,977
-
kW-mo/yr
- - - -
03 2.7111: Reduce illumination to minimum necessary levels $1,249 - $1,249
41,618
kWh
- - - - -
04 2.2135: Repair and eliminate steam leaks $342 $80 - - $342
-
MMBtu
- - -
05 2.4239: Eliminate or reduce compressed air usage $142 - $26
1,465
kWh
$116
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $30,100 $12,606 $1,416
47,772
kWh
$2,093
-
kW-mo/yr
$342
-
MMBtu
$3,510
-
lb
$(-2,527.0) $25,266
TOTAL IMPLEMENTED $1,733 $80 $1,275
43,083
kWh
$116
-
kW-mo/yr
$342
-
MMBtu
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs