ITAC Assessment: TN0572
ITAC logo
ITAC Assessment: TN0572
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Uniform pants and outerwear
NAICS
n/a
SIC 2311: Men's and Boys' Suits, Coats, and Overcoats
Sales Range $50
M
to 100
M
# of Employees 425
Plant Area 185,000
ft2
Annual Production 28,109,250
pieces
Production Hrs. Annual 3,557
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $268,873 4,497,069
kWh
Electricity Demand $130,841 14,308
kW-mo/yr
Natural Gas $52,147 10,252
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $169,049 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,156

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings By-product Production Savings
01 3.5313: Increase amount of waste recovered for resale $149,480 $150,000 - - - $12,480
-
lb
$(-25,000.0) $162,000
02 2.3191: Use demand controller or load shedder $13,909 $15,800 - $13,909
-
kW-mo/yr
- - - -
03 2.7124: Make a practice of turning off lights when not needed $1,987 - $1,987
33,118
kWh
- - - - -
04 2.7111: Reduce illumination to minimum necessary levels $1,413 - $712
23,740
kWh
$701
-
kW-mo/yr
- - - -
05 2.2511: Insulate bare equipment $1,469 $1,548 - - $1,469
-
MMBtu
- - -
06 2.2122: Install / repair insulation on condensate lines $454 $472 - - $454
-
MMBtu
- - -
07 2.2511: Insulate bare equipment $337 $286 - - $337
-
MMBtu
- - -
TOTAL RECOMMENDED $169,049 $168,106 $2,699
56,858
kWh
$14,610
-
kW-mo/yr
$2,260
-
MMBtu
$12,480
-
lb
$(-25,000.0) $162,000
TOTAL IMPLEMENTED $18,156 $18,106 $1,987
33,118
kWh
$13,909
-
kW-mo/yr
$2,260
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs