Assessment Year | 1996 |
---|---|
Principal Product | Uniform pants and outerwear |
NAICS |
n/a
|
SIC | 2311: Men's and Boys' Suits, Coats, and Overcoats |
Sales Range | $50 M to 100M |
# of Employees | 425 |
Plant Area |
185,000
ft2
|
Annual Production | 28,109,250
pieces
|
Production Hrs. Annual | 3,557
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $268,873 | 4,497,069 |
kWh
|
$0.060 |
Electricity Demand | $130,841 | 14,308 |
kW-mo/yr
|
$9.14 |
Natural Gas | $52,147 | 10,252 |
MMBtu
|
$5.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $169,049 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,156 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.5313: Increase amount of waste recovered for resale | $149,480 | $150,000 | - | - | - |
$12,480
-
lb
|
$(-25,000.0) | $162,000 | |
02 | 2.3191: Use demand controller or load shedder | $13,909 | $15,800 | - |
$13,909
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7124: Make a practice of turning off lights when not needed | $1,987 | - |
$1,987
33,118
kWh
|
- | - | - | - | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $1,413 | - |
$712
23,740
kWh
|
$701
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.2511: Insulate bare equipment | $1,469 | $1,548 | - | - |
$1,469
-
MMBtu
|
- | - | - | |
06 | 2.2122: Install / repair insulation on condensate lines | $454 | $472 | - | - |
$454
-
MMBtu
|
- | - | - | |
07 | 2.2511: Insulate bare equipment | $337 | $286 | - | - |
$337
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $169,049 | $168,106 |
$2,699
56,858
kWh
|
$14,610
-
kW-mo/yr
|
$2,260
-
MMBtu
|
$12,480
-
lb
|
$(-25,000.0) | $162,000 | ||
TOTAL IMPLEMENTED | $18,156 | $18,106 |
$1,987
33,118
kWh
|
$13,909
-
kW-mo/yr
|
$2,260
-
MMBtu
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs