ITAC Assessment: TN0569
ITAC logo
ITAC Assessment: TN0569
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Plastic Extrusion Molding
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 54
Plant Area 50,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 6,732
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,340 1,194,607
kWh
Electricity Demand $25,963 3,134
kW-mo/yr
Electricity Fees $1,144 -
Natural Gas $6,907 1,057
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,637 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $318

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 3.8314: Purchase high materials in returnable bulk containers $18,480 - - - $18,480
-
lb
- - - -
02 3.5212: Regrind, reuse, or sell scrap plastic parts $3,578 $4,440 $(-500.0)
(-16,706)
kWh
- - $(-5,712.0) $(-200.0) - $9,990
03 2.7144: Install spectral reflectors / delamp $5,833 $17,762 $2,971
99,062
kWh
$2,122
-
kW-mo/yr
- - - $740 -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,428 $4,000 - $4,428
-
kW-mo/yr
- - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $318 $30 $158
5,275
kWh
$160
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $32,637 $26,232 $2,629
87,631
kWh
$6,710
-
kW-mo/yr
$18,480
-
lb
$(-5,712.0) $(-200.0) $740 $9,990
TOTAL IMPLEMENTED $318 $30 $158
5,275
kWh
$160
-
kW-mo/yr
- - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs