ITAC Assessment: TN0567
ITAC logo
ITAC Assessment: TN0567
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Alcoholic beverages
NAICS
n/a
SIC 2085: Distilled and Blended Liquors
Sales Range greater than $500
M
# of Employees 100
Plant Area 500,000
ft2
Annual Production 13,000
Tgal
Production Hrs. Annual 6,048
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $870,433 21,486,518
kWh
Electricity Demand $289,561 42,186
kW-mo/yr
Natural Gas $57,028 19,037
MMBtu
Wood $121,750 900,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,295,710 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Wood Savings Gaseous Waste Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
01 3.1182: Make a new by-product $3,153,280 $5,059,000 n/a $(-2,000,000.0)
(-76,923,213)
kWh
- - - $8,000,000
-
lb
$(-846,720.0) $(-2,000,000.0) -
02 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $772,731 $2,866,500 n/a $870,433
21,486,518
kWh
- $(-29,180.0)
-
MMBtu
$(-68,522.0)
-
MMBtu
- - - -
03 3.1182: Make a new by-product $329,700 $7,300 n/a - - - - - $(-37,800.0) $(-30,000.0) $397,500
04 2.2514: Cover open tanks $19,440 $25,100 n/a - - - $19,440
-
MMBtu
- - - -
05 2.3212: Optimize plant power factor $10,799 $27,000 n/a - $10,799
-
kW-mo/yr
- - - - - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,760 $3,885 n/a $4,991
191,970
kWh
$4,769
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $4,295,710 $7,988,785 $(-1,124,576.0)
(-55,244,725)
kWh
$15,568
-
kW-mo/yr
$(-29,180.0)
-
MMBtu
$(-49,082.0)
-
MMBtu
$8,000,000
-
lb
$(-884,520.0) $(-2,030,000.0) $397,500
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Wood Savings Gaseous Waste Savings Personnel Changes Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs