Assessment Year | 1995 |
---|---|
Principal Product | Vinyl-coated polyester fabrics |
NAICS |
n/a
|
SIC | 2295: Coated Fabrics, Not Rubberized |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
100,000
ft2
|
Annual Production | 15,000
thousand feet
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $206,897 | 4,487,984 |
kWh
|
$0.046 |
Natural Gas | $102,348 | 30,343 |
MMBtu
|
$3.37 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $758,586 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,610 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7144: Install spectral reflectors / delamp | $8,547 | $16,638 |
$7,721
189,332
kWh
|
- | - | - | - | $826 | - | |
02 | 2.2136: Install / repair insulation on steam lines | $816 | $134 | - |
$816
-
MMBtu
|
- | - | - | - | - | |
03 | 2.7144: Install spectral reflectors / delamp | $3,191 | - |
$3,191
78,546
kWh
|
- | - | - | - | - | - | |
04 | 2.2122: Install / repair insulation on condensate lines | $643 | $245 | - |
$643
-
MMBtu
|
- | - | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,115 | $701 |
$2,115
33,411
kWh
|
- | - | - | - | - | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,625 | $1,540 |
$1,625
32,532
kWh
|
- | - | - | - | - | - | |
07 | 2.2511: Insulate bare equipment | $303 | $170 | - |
$303
-
MMBtu
|
- | - | - | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,313 | - |
$1,313
25,205
kWh
|
- | - | - | - | - | - | |
09 | 2.8113: Purchase gas directly from a contract gas supplier | $10,235 | - | - |
$10,235
-
MMBtu
|
- | - | - | - | - | |
10 | 3.1182: Make a new by-product | $664,104 | $275,000 | - | - |
$8,350
-
lb
|
$(-163,939.0) | - | - | $819,693 | |
11 | 3.1182: Make a new by-product | $45,294 | $100,000 | - | - |
$5,010
-
lb
|
$(-25,000.0) | - | - | $65,284 | |
12 | 3.8314: Purchase high materials in returnable bulk containers | $11,700 | $10,200 | - | - |
$7,800
-
lb
|
$3,000 | $900 | - | - | |
13 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $8,700 | $8,480 | - | - | - | $(-2,080.0) | - | - | $10,780 | |
TOTAL RECOMMENDED | $758,586 | $413,108 |
$15,965
359,026
kWh
|
$11,997
-
MMBtu
|
$21,160
-
lb
|
$(-188,019.0) | $900 | $826 | $895,757 | ||
TOTAL IMPLEMENTED | $29,610 | $29,383 |
$15,965
359,026
kWh
|
$1,119
-
MMBtu
|
$7,800
-
lb
|
$3,000 | $900 | $826 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs