ITAC Assessment: TN0548
ITAC logo
ITAC Assessment: TN0548
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product vinyl and aluminum windows and doors
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 230,000
ft2
Annual Production 450,000
pieces
Production Hrs. Annual 4,862
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,321 2,439,625
kWh
Natural Gas $18,681 3,193
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,209 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,304

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7124: Make a practice of turning off lights when not needed $4,375 - $4,375
141,559
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,247 $2,300 $1,247
23,447
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $578 $980 $578
16,999
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $905 - $905
16,999
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,104 $482 $1,104
13,775
kWh
TOTAL RECOMMENDED $8,209 $3,762 $8,209
212,779
kWh
TOTAL IMPLEMENTED $7,304 $3,762 $7,304
195,780
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs