Assessment Year | 1994 |
---|---|
Principal Product | Carbon and stainless steel, copper, aluminum, brass, bronze |
NAICS |
n/a
|
SIC | 3325: Steel Foundries, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 75 |
Plant Area |
20,000
ft2
|
Annual Production | 1,040,000
pieces
|
Production Hrs. Annual | 4,940
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $79,463 | 1,395,662 |
kWh
|
$0.057 |
Natural Gas | $62,300 | 9,143 |
MMBtu
|
$6.81 |
LPG | $3,994 | 360 |
MMBtu
|
$11.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,991 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,959 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.2514: Cover open tanks | $8,253 | $100 |
$8,253
144,783
kWh
|
- | - | |
02 | 2.2531: Re-size charging openings or add movable cover or door | $3,332 | - |
$3,332
143,611
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $434 | $450 |
$434
7,620
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $234 | $200 |
$234
4,103
kWh
|
- | - | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $150 | $330 |
$150
2,638
kWh
|
- | - | |
06 | 3.8133: Convert to aqueous cleaning | $9,690 | $36,600 | - |
$9,690
-
gal
|
- | |
07 | 3.7223: Install shrouding on machines to prevent splashing | $7,800 | $344 | - | - |
$7,800
-
lb
|
|
08 | 3.5221: Recycle casting sand | $5,592 | $16,000 | - | - |
$5,592
-
lb
|
|
09 | 3.7212: Improved material handling (mixing and transfer) | $5,574 | - | - | - |
$5,574
-
lb
|
|
10 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,932 | $8,480 | - | - |
$1,932
-
lb
|
|
TOTAL RECOMMENDED | $42,991 | $62,504 |
$12,403
302,755
kWh
|
$9,690
-
gal
|
$20,898
-
lb
|
||
TOTAL IMPLEMENTED | $24,959 | $444 |
$11,585
288,394
kWh
|
- |
$13,374
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs