ITAC Assessment: TN0508
ITAC logo
ITAC Assessment: TN0508
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Pre-engineered metal buildings
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 190,000
ft2
Annual Production 3,500
ton
Production Hrs. Annual 5,616
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,357 3,809,203
kWh
Natural Gas $81,301 15,635
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,521 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,009

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4314: Use synthetic lubricant $1,313 - $1,313
32,825
kWh
02 2.6218: Turn off equipment when not in use $1,160 - $1,160
29,015
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $199 $250 $199
4,982
kWh
04 2.3191: Use demand controller or load shedder $4,849 $240 $4,849
-
kWh
05 2.3212: Optimize plant power factor $33,000 $15,800 $33,000
-
kWh
TOTAL RECOMMENDED $40,521 $16,290 $40,521
66,822
kWh
TOTAL IMPLEMENTED $6,009 $240 $6,009
29,015
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs