Assessment Year | 1993 |
---|---|
Principal Product | Lumber |
NAICS |
n/a
|
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $10 M to 50M |
# of Employees | 167 |
Plant Area |
50,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $308,498 | 3,823,271 |
kWh
|
$0.081 |
Natural Gas | $30,964 | 5,027 |
MMBtu
|
$6.16 |
Wood | $1,750 | 12,960 |
MMBtu
|
$0.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,777 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,243 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Wood Savings | Paper Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2212: Use minimum safe oven ventilation | $6,389 | $13,400 |
$5,698
71,219
kWh
|
- |
$691
-
MMBtu
|
- | |
02 | 2.2136: Install / repair insulation on steam lines | $434 | $321 | - |
$248
-
MMBtu
|
- |
$186
-
MMBtu
|
|
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,141 | $1,980 |
$3,141
39,273
kWh
|
- | - | - | |
04 | 2.6218: Turn off equipment when not in use | $2,227 | - |
$2,227
27,843
kWh
|
- | - | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $2,204 | - |
$2,204
27,550
kWh
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,039 | $750 |
$2,039
25,498
kWh
|
- | - | - | |
07 | 2.2122: Install / repair insulation on condensate lines | $273 | $65 |
$273
12,896
kWh
|
- | - | - | |
08 | 2.3212: Optimize plant power factor | $16,070 | $19,400 |
$16,070
-
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $32,777 | $35,916 |
$31,652
204,279
kWh
|
$248
-
MMBtu
|
$691
-
MMBtu
|
$186
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,243 | $750 |
$4,243
53,048
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Wood Savings | Paper Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs