ITAC Assessment: TN0502
ITAC logo
ITAC Assessment: TN0502
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Lumber
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $10
M
to 50
M
# of Employees 167
Plant Area 50,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,125
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $308,498 3,823,271
kWh
Natural Gas $30,964 5,027
MMBtu
Wood $1,750 12,960
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,777 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,243

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Wood Savings Paper Savings
01 2.2212: Use minimum safe oven ventilation $6,389 $13,400 $5,698
71,219
kWh
- $691
-
MMBtu
-
02 2.2136: Install / repair insulation on steam lines $434 $321 - $248
-
MMBtu
- $186
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,141 $1,980 $3,141
39,273
kWh
- - -
04 2.6218: Turn off equipment when not in use $2,227 - $2,227
27,843
kWh
- - -
05 2.7111: Reduce illumination to minimum necessary levels $2,204 - $2,204
27,550
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,039 $750 $2,039
25,498
kWh
- - -
07 2.2122: Install / repair insulation on condensate lines $273 $65 $273
12,896
kWh
- - -
08 2.3212: Optimize plant power factor $16,070 $19,400 $16,070
-
kWh
- - -
TOTAL RECOMMENDED $32,777 $35,916 $31,652
204,279
kWh
$248
-
MMBtu
$691
-
MMBtu
$186
-
MMBtu
TOTAL IMPLEMENTED $4,243 $750 $4,243
53,048
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Wood Savings Paper Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs