ITAC Assessment: TN0499
ITAC logo
ITAC Assessment: TN0499
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product cable
NAICS
n/a
SIC 2298: Cordage and Twine
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 210,000
ft2
Annual Production 625,000,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $6,535,088 116,698,712
kWh
Natural Gas $57,282 13,275
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $113,986 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $84,147

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7224: Reduce space conditioning during non-working hours $40,654 $49 $40,654
725,967
kWh
02 2.4239: Eliminate or reduce compressed air usage $26,982 - $26,982
481,829
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $16,068 $500 $16,068
286,928
kWh
04 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $14,164 - $14,164
252,931
kWh
05 2.2511: Insulate bare equipment $9,913 $30 $9,913
177,022
kWh
06 2.7224: Reduce space conditioning during non-working hours $2,725 $350 $2,725
48,652
kWh
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,740 - $1,740
31,067
kWh
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,297 $380 $1,297
23,154
kWh
09 2.2511: Insulate bare equipment $443 $170 $443
7,913
kWh
TOTAL RECOMMENDED $113,986 $1,479 $113,986
2,035,463
kWh
TOTAL IMPLEMENTED $84,147 $719 $84,147
1,502,637
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs