Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Fermented Foods
NAICS 311421: Fruit and Vegetable Canning
SIC 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 30,000
ft2
Annual Production 5,000,000
units
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,986 606,628
kWh
Electricity Demand $57,937 1,715
kW-mo/yr
Natural Gas $18,262 1,537
MMBtu
Waste Disposal Costs
Water Usage $106,158 5,247
Tgal
TOTAL YEARLY COSTS $251,343
RECOMMENDED SAVINGS* $157,265 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,726

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,719 - $5,799
50,977
kWh
- - - $(-1,080.0) -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,182 $120 $840
7,389
kWh
$342
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,204 $25,635 $4,818
42,364
kWh
$5,568
-
kW-mo/yr
- - $651 $167
04 2.4231: Reduce the pressure of compressed air to the minimum required $475 $1,214 $475
4,180
kWh
- - - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,119 $19,959 $5,119
45,014
kWh
- - - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $403 $1,776 $403
3,521
kWh
- - - - -
07 2.9114: Use solar heat to make electricty $67,154 $343,660 $44,156
388,287
kWh
$22,998
-
kW-mo/yr
- - - -
08 3.1223: Use fog nozzles / spray rinsing instead of immersion rinsing $22,925 $1,810 - - $5,995
-
MMBtu
$16,930
-
Tgal
- -
09 3.1222: Reduce water use with counter current rinsing $44,084 $48,094 - - $3,378
-
MMBtu
$9,506
-
Tgal
$31,200 -
TOTAL RECOMMENDED $157,265 $442,268 $61,610
541,732
kWh
$28,908
-
kW-mo/yr
$9,373
-
MMBtu
$26,436
-
Tgal
$30,771 $167
TOTAL IMPLEMENTED $39,726 $30,435 $11,495
101,042
kWh
$5,568
-
kW-mo/yr
$5,995
-
MMBtu
$16,930
-
Tgal
$(-429.0) $167
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs